• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SHIFT LINKAGE ADJUSTMENT - Continued
SHIFT LINKAGE ADJUSTMENT - Continued

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  523    524    525    526    527  528  529    530    531    532    533  
img
TM 5-5420-202-20-3
SHIFT LINKAGE ADJUSTMENT (Sheet 15 of 28)
NOTE
Do not allow shifting rod (BB) to turn while doing
step 76. Shifting rod (BB) is made up of more than
one piece and may come apart if allowed to turn.
76.
Using 9/16 inch wrench, adjust shifting rod
bearing end (BC) by turning clockwise or
counterclockwise until screw (AZ) will drop
freely through clevis (BA) and shifting rod
bearing end (BC).
RIGHT REAR OF
ENGINE COMPARTMENT
Using small diameter wire, check to see if
shifting rod (BB) is past holes (BD) and
(BE). If shifting rod (BB) is past holes
(BD) and (BE), do steps 78 thru 80. If
shifting rod (BB) is not past hole (BD), do
steps 82 thru 91. If shifting rod (BB) is
not past hole (BE), go on to step 92.
FORWARD OUTBOARD
LINK ASSEMBLY
78.
Using 9/16 inch wrench, install screw (AZ).
79.
Holding rod bearing ends (BC) and (BF) with 9/16 inch wrench, use torque wrench and
9/16 inch crow foot adapter to tighten jamnuts (AX) and (AY) to 16-18 lb-ft (22-24 Nm)
and remove locating pin (AU) from alinement holes.
Using torque wrench and 9/16 inch socket, tighten screw (AZ) to 16-18 lb-ft (22-24 Nm)
80.
and go to step 103.
Go on to Sheet 16
TA249332
11-66


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.