TM 5-5420-202-34
FINAL DRIVE REPAIR (Sheet 21 of 30)
Position carrier (N) on wood blocks.
26.
27.
Place new gasket (P) on carrier (N).
Aline holes.
28.
Using suitable lifting device, install
assembled shaft (A) into carrier (N). It
may be necessary to tap sides of carrier
(N) to seat shaft (A). Make sure gasket (P)
is on screws (Q) and screws (Q) line up with
holes in carrier (N).
29.
Using 3/4 inch wrench, tighten eight
screws (Q). Using torque wrench with
crowfoot, tighten screws to 90-130 lb-ft
(122-176 Nm).
Install lockwire in pairs on screws (Q).
30.
31.
Using suitable lifting device, turn carrier
(N) over and support with wood blocks
for further assembly.
32.
Install spacer (R) on output shaft (A)
assembly, wide end toward output shaft
flange.
Go on to Sheet 22
7-21
Change 2