ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
a.
Fitting Anchor Assembly and First Link
When the anchor link is ready for fitting, the bridge is at 1 0p0 (over RRB). Therefore bay 1 is in front of the capsill
roller beam.
(1)
Position anchor assembly (AA) under bay 1 with anchor junction block facing away from gap.
NOTE
Lumber packing must be used under the anchor assembly to prevent fouling of assembly with the
cross girder. It Is easier to place the packing after the assembly Is In place, than it Is before placing
the assembly on the cross girder.
(2)
Place a piece of packing on cross girder under anchor assembly. Size of packing to be used is: 3 in x 8 in x 84
in. This packing is used as a skid to prevent fouling of the anchor assembly on the cross girder, and will remain
in position, either on the cross girder, or on the ground in front of the cross girder, while the remainder of the link
is assembled.
(3)
Remove the retainer clip and bracing pin from the fork end anchor. Swing fork end anchors out to the operating
position.
4-53