ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
(4)
The long link of the anchor assembly is positioned on the skid as shown below.
(5)
Push anchor assembly forward and fit fork end anchors of the long link over bottom panel pin at panel point 1p0.
The retainer clip through the panel pin must be removed, and then replaced once the end anchor is in place.
Note the fork ends have elongated holes for easy connection.
(6)
Lock the fork end anchors in operating position with bracing pin and put retainer clip through the end of bracing
pin.
(7)
Boom bridge to 11 p0 over rear roller beam. Lock rollers.
(8)
Connect the fork end anchors of the short link to the bottom panel pin at panel point 2p0, as described in steps
(4), (5) and (6).