ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-16-4.ASSEMBLY 2E + 22 BAY - W/O LINK REINFORCEMENTa.Set up and align roller beams(1)Assemble capsill roller beam (CRB) front roller beam (FRB) and rear roller beam (RRB) and position onsite as shown (para. 4-5c.).(2)Ensure roller beams are level.CAUTIONIt is very Important that roller beams be correctly positioned at this time. If they are not, seriousproblems will arise during construction due to the bridge deviating from the centerline.b.Assembly(1)Perform steps b. (1) thru (9) in paragraph 61 to assemble end of bridge, bays 1 thru 5 and launchingnose up to 6N1, with LRP secured on launching nose.(2)Add three double story nose sections (1N2, 2N2, 3N2), booming the nose forward and securing with apanel pin in nose roller as each double story nose is added (para. 4-12c.). Ensure that launching noselink is vertical.(3)Add bay 6 including sway brace.6-45
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business