• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ENGINE MOUNTS (LEFT AND RIGHT) REPLACEMENT - Continued
TRANSMISSION MOUNTS (LEFT AND RIGHT) REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -2 Page Navigation
  46    47    48    49    50  51  52    53    54    55    56  
img
. . . . .
TM 5-5420-226-20-2
TRANSMISSION MOUNTS (LEFT AND RIGHT) REPLACEMENT (Sheet 1 of 4)
PROCEDURE INDEX
PAGE
PROCEDURE
6-8
Removal
6-10
Cleaning and Inspection
6-10
Installation
Hammer
TOOLS: 3-1/8 in. socket with 3/4 in. drive
T-slide handle with 3/4 in. drive
Diagonal cutting pliers
3 1/4 in. extension with 3/4 in. drive
Slip joint pliers
1-1/2 in. open end wrench
1-1/2 in. socket with 3/4 in. drive
Ratchet with 3/4 in. drive
3/4 in. socket with 1/2 in. drive
Ratchet with 1/2 in. drive
1 1/4 in. open end wrench
Bench vise
Torque wrench with 3/4 in. drive (0-600 lb-ft) (0-813 Nm)
1/2 in. square drive bit screwdriver
Torque wrench with 1/2 in. drive (0-175 lb-ft) (0-237 Nm)
SPECIAL TOOLS: Resilient mount mechanical puller (Item 33, Chapter 3, Section 1)
SUPPLIES:
Drycleaning solvent (Item 55, Appendix D)
Lockwire (Item 61, Appendix D)
Rags (Item 12, Appendix D)
PERSONNEL: TW O
Remove powerplant (page 5-2).
P R E L I M I N A R Y PROCEDURE
NOTE
The procedure described below applies to both the right and left transmis-
sion mounts.
TA107478
Go on to Sheet 2
6-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.