• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FUEL BACKFLOW VALVE REPLACEMENT - Continued
TUBE ASSEMBLY (FUEL INJECTION PUMP INLET TO BULKHEAD ELBOW) REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -2 Page Navigation
  207    208    209    210    211  212  213    214    215    216    217  
img
. . . . . .
TM 5-5420-226-20-2
TUBE ASEMBLY (FUEL INJECTION PUMP INLET TO BULKHEAD ELBOW)
REPLACEMENT (Sheet 1 of 5)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
7-30
Cleaning and Inspection
7-31
Installation
7-31
TOOLS:
1 in. combination box and open end wrench
7/8 in. combination box and open end wrench
3/4 in. combination box and open end wrench
3/8 in. combination box and open end wrench
Wire brush
Flat-tip screwdriver
SPECIAL TOOLS: Ground hop kit (Item 30, Chapter 3, Section I)
SUPPLIES:
Rags (Item 12, Appendix D)
Drain pan
Sealing compound (Item 27, Appendix D)
Dry cleaning solvent (Item 55, Appendix D)
Remove powerplant (page 5-2)
PRELIMINARY PROCEDURES:
Remove cooling fans (page 9-56)
Go on to Sheet 2
TA107634
7-29


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.