TM 5-5420-226-20-2
ACCELERATOR LINKAGE ADJUSTMENT (Sheet 1 of 6)
TOOLS:
Long round nose pliers
9/16 in. combination box and open end wrench (2 required)
1/2 in. combination box and open end wrench (2 required)
7/16 in. combination box and open end wrench
Flashlight
FABRICATED TOOLS: Throttle linkage adjusting go/no-go gage (Figure
F-3, Appendix F)
SUPPLIES:
1/8 in. dia. by 2 in. by 4 in. long locating pins (2 required)
1/16 in. dia. by 2 in. long pin
Cotter pins (4 required)
PERSONNEL: TWO
PRELIMINARY PROCEDURES:
Remove operator's floor access plate (page 17-10)
Block tracks to prevent tank movement (TM 5-5420-226-
10)
Go on to Sheet 2
TA107944